Services

Our Services

OUR KEY AREAS OF EXPERTISE

  • Development of Builder work drawings
  • Development of Shop drawings
  • Development of Coordination drawings
  • Development of construction drawings
  • HVAC Ducting works
  • Sound Attenuation
  • Chilled Water Pipe Installation
  • Installation of Exhaust Fans
  • Installation of Chillers, AHU’s, FCU’s, FAHU’s
  • Installation of Package Units
  • Installation of all Ducted Split Units
  • Installation of VRF System
  • Valve Package for AHU’s, Chillers, FCU’s & Pumps
  • Installation of CHW pumps / Chemical Dosing Unit / Pressurization Units
  • Installation of VCD/FD/NRD/Split Dampers
  • Aluminum Cladding Works (Pipe & Duct)
  • CHW Pipe Pressure Testing
  • Refrigerant Piping Works
  • Air Terminals Installation
  • Thermostat and Controllers
  • Air Balancing
  • Building Management System
  • Testing and commissioning
  • Approval Process from Authorities
  • As Built Drawings
  • Operation and Maintenance Manual
  •  
  • Development Of Builder Work Drawings
  • Development of Shop drawings
  • Development of Coordination drawings
  • Development of construction drawings
  • Containments PVC & GI
  • Cable Management System
  • Wiring and Cabling
  • Earthing System
  • Bus-Bar Trunking
  • Switch Gear System
  • Metering & Instrumentation
  • Emergency Power Supply
  • Wiring Accessories
  • Disconnecting Switch
  • Light Filling Installation
  • Lightning Protecting System
  • Aircraft Warning Light System
  • Testing and commissioning
  • Approval Process from Authorities
  • As Built Drawings
  • Operation and Maintenance Manual
  • Development of Builder work drawings
  • Development of Shop drawings
  • Development of Coordination drawings
  • Development of construction drawings
  • Installation of Lowe Level Drainage Network
  • Installation of High Level Drainage Network
  • Installation of PEX System, PPR Network..etc.
  • Installation of all Types of Water Pumps
  • Installation of Water Heating and Cooling Systems
  • Installation of Water Filtration System
  • Installation of Acoustic Pipes, Fittings & Acoustic Lagging.
  • Installation of all types of traps, Manholes, Grease Traps…etc.
  • Pressure Testing for Water Supply Pipes
  • Gravity Testing for Drainage Pipes
  • Installation of Sanitary Wares
  •  Testing and commissioning
  • Approval Process from Authorities
  • As Built Drawings
  • Operation and Maintenance Manual
  • Development of Builder work drawings
  • Development of Shop drawings
  • Development of Coordination drawings
  • Development of construction drawings
  • Installation of Sprinkler Pipes
  • Installation of Zone Control Valve
  • Installation of Wet Riser Pipes
  • Installation of Sprinkler Heads
  • Installation of Breeching Inlets
  • Installation of Fire Extinguisher
  • Installation of Fire Blankets
  • Installation of Fire Hose reel Cabinets
  • Installation of PRVs, Isolation Valve…etc.
  • Installation of Landing Valves & Fire Hose Reels
  • Installation of Suppression System (Clean Agent System, Deluge System, Pre – action System… etc.)
  • Installation of Fire Pump Rooms including all networks, Valves, accessories, control Panel, Alarm Check Valves, NRVs…Etc.
  • Pressure Testing for Fire Fighting Pipes
  • Testing and commissioning
  • Approval Process from Authorities
  • As Built Drawings
  • Operation and Maintenance Manual
  • Development of Builder work drawings
  • Development of Shop drawings
  • Development of Coordination drawings
  • Development of construction drawings
  • Containment and Cabling for Alarm System, Voice Evacuation System, Firemen Telephone System, Emergency Lighting System.
  • Installation of Smoke Detectors, Manual Call Points, Sounders, Speaker, Modules, Emergency Lights, Exit Lights…Etc.
  • Installation of Fire Alarm Control Panels.
  • Installation of Repeater Panels,
  • Mimic Panel…Etc
  • Installation of Emergency Lighting
  • Monitoring Panels.
  • Installation of Central Battery Panels.
  • Installation of Battery Banks.
  • Installation of Modules and Interfacing with Third party System.
  • Installation of Suppression System Control panels and accessories.
  • Loop Checking and Circuit Terminations.
  • Programming and Interfacing
  • Labelling and Identification
  • Testing and commissioning
  • Approval Process from Authorities
  • As Built Drawings
  • Operation and Maintenance Manual
  • Development of Builder work drawings
  • Development of Shop drawings
  • Development of Coordination drawings
  • Development of construction drawings
  • Containments PVC & GI
  • Cable Management System
  • Structured Cabling System
  • CCTV System
  • SMATV System
  • CATV System
  • MATV System
  • IP TV System
  • Audio / Video Intercom System
  • Gate Barrier System
  • Door Access Control System
  • Burglar Alarm System
  • Disabled Toilet Alarm System
  • AV / BGM System
  • Home Automation System
  • Testing and commissioning
  • Approval Process from Authorities
  • As Built Drawings
  • Operation and Maintenance Manual